Three decades of water, transport, environmental and industrial work — most recently based in Lesotho, with roots across Southern Africa and the Middle East.
Expansion of pumping, transmission and reticulation infrastructure serving Maseru’s south-eastern peri-urban areas: 170km of pipeline and road works in Phase I, followed by a 5.2km force main, roughly 300km of distribution networks, 6,000 household connections, and new reservoir and pumping infrastructure in Phase II.
Design review, procurement, and construction supervision for infrastructure serving a 270,000 m² industrial estate, enabling 67,000 m² of leasable industrial land. Scope covered roads, water, stormwater, MV/LV electrical, fire systems and sewer/treatment infrastructure, plus 11 factory shell buildings totalling 30,000 m².
Prior to and alongside its Lesotho operations, our team delivered water, wastewater, transport and environmental assignments across Southern Africa, Jordan and the wider region.
A fuller project history is available on request.